Concrete Pad is Ready for Air Conditioning Unit





Framed out and poured the concrete pad Monday for the air conditioning unit to sit on. The air conditioner will sit outside the rear of the barn and the heating unit will be inside on the second floor with duct work running along the ceiling of the tasting room in an L shape. Suzanne had seen some beautiful copper duct work online but it was extremely expensive, so we came up with the idea of painting the tin duct work with copper paint. We tested a three foot section and it came out great. I will add a few photos of it later.