The big push is on at the winery. So much going on and it feels great to be making some serious headway. It seems like all we have been doing is ripping things out of the barn for the last few years. Now we're having things put back into it. The solar panels are up and running, good by PECO. The insulation and electric are all done in the tasting room, ready for the drywallers to show up this Friday. It is a big room, should take about two weeks. The Ash and Walnut boards we had milled from our own trees are drying nicely and will go to the wood shop in Boyertown soon to have the tops planned and the tongue and groove sides milled into them for floorboards. They are going to look beautiful, random width as large as 10 inches down to 6 inches. The floor goes in once the heating and air conditioning is to be installed in May.