A little more progress on the winery tasting room as we install ceiling fans. The raw floor boards will be going to the mill next week to be planned on both sides and have a tongue and groove put in them. Should take about two weeks to get them back and start laying them down. Once the floor is in we'll stain it. Should look beautiful. The wood is from trees on our property that were sawn into rough boards.